国产丝袜在线精品丝袜|在线A毛片免费视频观|日韩精品久久久一区二区|亚洲成在人网站天堂直播|99在线精品66视频无码|亚洲欧美不卡视频在线播放|国产精品久久久久久免费一级|久久精品国产亚洲AV香蕉软件

2 tunnels dug through in China-Laos Railway construction

Source: Xinhua| 2019-04-15 19:28:29|Editor: zh
Video PlayerClose

LAOS-OUDOMXAY-CHINA-LAOS RAILWAY-TUNNEL CONSTRUCTION

A staff member of China Railway No. 5 Engineering Group stands at the entrance to Nathong No. 2 Tunnel of China-Laos Railway after the tunnel was dug through in Oudomxay Province of Laos, some 400 km north of Lao capital Vientiane, April 15, 2019. Two tunnels of the China-Laos Railway, namely Nathong No. 2 and Nateuy No. 2, were dug through on the same day on Monday by the constructor China Railway No. 5 Engineering Group. (Xinhua/Hu Yong)

   Prev 1 2  

KEY WORDS:
YOU MAY LIKE
EXPLORE XINHUANET
010020070750000000000000011100001379790851