国产丝袜在线精品丝袜|在线A毛片免费视频观|日韩精品久久久一区二区|亚洲成在人网站天堂直播|99在线精品66视频无码|亚洲欧美不卡视频在线播放|国产精品久久久久久免费一级|久久精品国产亚洲AV香蕉软件

        1. <i id="avp7g"><ins id="avp7g"></ins></i>
          <td id="avp7g"><tr id="avp7g"></tr></td>
        2. <small id="avp7g"><dl id="avp7g"><small id="avp7g"></small></dl></small>
        3. <track id="avp7g"><dl id="avp7g"><delect id="avp7g"></delect></dl></track>

          <source id="avp7g"><ins id="avp7g"></ins></source>
        4. <p id="avp7g"><pre id="avp7g"></pre></p>
          <td id="avp7g"><tr id="avp7g"></tr></td>
        5. Chinese firm completes beam closure along China-Laos railway

          Source: Xinhua| 2019-01-20 00:39:08|Editor: Li Xia
          Video PlayerClose

          LAOS-NAMOR-CHINA-LAOS RAILWAY-BEAM CLOSURE

          Chinese workers cast concrete at the site of the first cast-in-place continuous beam of the China-Laos railway at the under-construction Nathon Station Double-track Super Major Bridge, some 360 km north of Vientiane, capital of Laos, on Jan. 19, 2019. China Railway No. 5 Engineering Group (CREC-5) completed the closing of the first cast-in-place continuous beam on Saturday. The China-Laos railway has a length of over 414 km with bridges of 62 km under construction, linking Mohan-Boten border gate in northern Laos and Vientiane. (Xinhua/Huang Zongwen)

          NAMOR, Laos, Jan. 20 (Xinhua) -- A Chinese engineering company has completed the closing of the first cast-in-place continuous beam on Saturday.

          China Railway No. 5 Engineering Group (CREC-5) told Xinhua that at 03:20 local time on the same day, the company successfully completed the closure with cradle construction technique, at the under-construction Nathon Station Double-track Super Major Bridge, some 360 km north of Lao capital Vientiane.

          The cast-in-place continuous beam is of 36+64+36 meters, part of the 1,195.822-meter bridge.

          The construction of the railway bridges along the China-Laos railway made a breakthrough in 2018. China Railway No. 2 Engineering Group (CREC-2) has completed the main work construction of Nam Khone super major bridge, the longest bridge along China-Laos railway, also the longest-ever bridge in Laos in June. In July, all the foundation construction work of all the two cross-Mekong River super major bridges, namely the the Luang Prabang bridge and Ban Ladhan bridge, has been completed by CREC-8.

          The China-Laos railway has a length of over 414 km with bridges of 62 km under construction, linking Mohan-Boten border gate in northern Laos and capital Vientiane. Operating speed on the route is designed at 160 km per hour.

             1 2 3 4 5 Next  

          KEY WORDS: Laos
          YOU MAY LIKE
          EXPLORE XINHUANET
          010020070750000000000000011100001377581111
          巫溪县| 常熟市| 定兴县| 桂平市| 西宁市| 泾川县| 航空| 华容县| 翁牛特旗| 台山市| 珲春市| 枣阳市| 澄迈县| 榆林市| 寻乌县| 札达县| 瑞昌市| 敖汉旗| 布拖县| 徐汇区| 额济纳旗| 定远县| 静乐县| 筠连县| 宣威市| 奉化市| 台北市| 桦南县| 阆中市| 石首市| 丰顺县| 犍为县| 淮阳县| 灌南县| 旺苍县| 彩票| 清远市| 新兴县| 灵台县| 青神县| 满洲里市|